• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    Capella Intersects Copper-Rich Massive Sulfide Mineralization in Vein Zones at the Killero E Project, Northern Finland

    6/24/26 9:56:00 AM ET
    $AEM
    Precious Metals
    Basic Materials
    Get the next $AEM alert in real time by email

    Diamond Drilling to Commence on Killero W Gold Targets

    VANCOUVER, BC, June 24, 2026 /CNW/ - Capella Minerals Ltd. (TSXV:CMIL) (OTC:CMILF) (FRA: N7D) ("Capella" or the "Company") is pleased to report results from a maiden diamond drill program completed recently at the Killero E copper-gold project in the Central Lapland Greenstone Belt, Northern Finland. Killero E is one of five copper-gold projects that form part of the Tümad Madencilik Sanayi Ve Ticaret A.S. ("Tümad") earn-in Joint Venture ("JV") for Northern Finland (see Company News Release dated September 2, 2025), and 2,008m / 9 holes (8 completed and one abandoned) of diamond drilling were completed in this first-pass evaluation.

    The Capella-Tümad JV projects are located approximately 40km SW of Agnico Eagle Mines Ltd's ((", Agnico", , TSX:AEM, NYSE:AEM) producing Kittila Gold Mine1, with all five projects now being surrounded by Agnico following the successful closing of Agnico's acquisition of Rupert Resources Ltd (TSX:RUP) on June 16, 2026 (Figure 1).   

    Figure 1. Location map of the Capella-Tümad JV projects in Northern Finland (Killero E, Killero W, Jolhikko, Seisunselka, Saattopora W), together with the project areas acquired by Agnico as part of its consolidation of the Central Lapland Greenstone Belt. https://www.agnicoeagle.com/English/news-and-media/news-releases/news-details/2026/AGNICO-EAGLE-TO-CONSOLIDATE-FINLANDS-CENTRAL-LAPLAND-GREENSTONE-BELT-IN-THREE-SEPARATE-TRANSACTIONS/default.aspx (CNW Group/Capella Minerals Limited)



    1 References made to nearby mines and analogous deposits provide context for the Killero E project but are not necessarily indicative that this project hosts similar tonnages or grades of mineralization.

    Highlights

    • A total of 2,008m / 9 holes of diamond drilling was completed at the Killero E project as part of the Tümad earn-in JV. Drilling targeted the potential source of the historical Base of Till ("BoT") copper-gold anomalies identified at Killero E by Anglo American plc, together with an initial test of 800m strike extent of the regional NE-trending Killero Fault/Shear Zone (Figure 2; see also Company New Release dated May 30, 2023).
    • Drilling has confirmed that the Killero Fault/Shear Zone dips steeply to the NW and is characterized by a zone of quartz-carbonate(+/-tourmaline) veining up to 40m in width (downhole2) and with highly variable sulfide content (Figures 3A to 3C). Host rocks are dominantly fine-grained meta-gabbro and mafic meta-volcanic rocks.
    • Copper-silver ("Cu-Ag") mineralization hosted in quartz-carbonate veins/veinlets was intersected in most holes, with the most significant reportable intercepts including:
      • KE-001A: 0.76m @ 3.7% Cu + 19.6 g/t Ag from 182.83m downhole. Massive pyrrhotite and chalcopyrite hosted within quartz-carbonate vein (Figure 3C).  
      • KE-003: 0.55m @ 0.6% Cu + 5 g/t Ag from 181.15m downhole.
      • KE-006: 0.70m @ 1.5% Cu + 7 g/t Ag from 114.2 downhole (Figure 4) and 0.50m @ 0.7% Cu + 3 g/t Ag from 178.8m downhole.
    • Drill hole KE-004 also intersected foliation parallel zinc-copper-silver ("Zn-Cu-Ag") style mineralization in meta-gabbro prior to being terminated prematurely at 50.5m as a result of a mechanical failure on the drill rig. The Company interprets this mineralization style and metal association to indicate proximity to a nearby massive sulfide occurrence.
      • KE-004: 5m @ 0.4% Zn + 0.2% Cu + 2 g/t Ag from 36.5m downhole.
    • Diamond drilling is currently expected to commence on the two priority gold targets on the nearby Killero W project by June 30, 2026.


    2 Insufficient drilling has been completed to accurately determine true thickness, but the Company estimates that true thicknesses are approximately 80% of reported downhole thicknesses. 

    Figure 2. Locations of diamond drill holes at Killero E and the peak historical BoT copper value, all overlain on the Company’s high resolution drone magnetic data. Magnetic

    Figure 3. A) Quartz-carbonate veining marking the top of the Killero Fault/Shear Zone (KE-001 155m, HQ core), B) Chalcopyrite-pyrrhotite mineralization hosted in quartz-carbonate vein (KE-001B 37.9m, HQ core), and C) Massive pyrrhotite and chalcopyrite in KE-001A 182.83-183.59m (0.76m @ 3.7% Cu + 19 g/t Ag) HQ core. (CNW Group/Capella Minerals Limited)

    Figure 4. Quartz-carbonate-sulfide veining in KE-006. A) 59-60m and B) 114-115m. NQ core. (CNW Group/Capella Minerals Limited)

    Eric Roth, Capella's President and CEO, commented: "I am pleased to be reporting today results from our maiden diamond drilling program at the Killero E project in Northern Finland, and which also represents the first drill meters to be completed under our Scandinavian JV with Tümad. In spite of experiencing a number of operational and logistical challenges - and culminating in significantly longer than expected turnaround times for assays - this drill program has provided us with an excellent first look at the geology and mineralization styles underlying the historical BoT anomalies at Killero E. Our data reviews are ongoing and will focus on determining potential vectors to copper-silver and gold deposits both within the immediate project area and along strike extensions of the district-scale Killero Fault/Shear Zone."

    Upcoming Drill Programs and News Flow – Finland and Norway

    • Killero W – first-pass diamond drilling of two priority gold targets in the Killero W permit is currently expected to begin by June 30, 2026. The Killero W targets are both defined by gold-rich Base of Till ("BoT") geochemical anomalies that are broadly associated with NE-trending structural corridors.
    • Jolhikko and Seisunselka – 4 reconnaissance Base of Till ("BoT") and Top of Bedrock ("ToB") survey lines were completed over the Jolhikko and Seisunselka gold targets. A total of 102 BoT and 55 ToB samples were collected and sent to ALS Laboratories for analysis. A determination of potential targets for follow-up diamond drilling will be made as soon as results have been reviewed.
    • Hessjøgruva (Norway) - permitting for the planned 8,000m diamond drill program at the advanced exploration-stage Hessjøgruva copper-cobalt-zinc project in central Norway continues. The Company has been advised that the Hessjøgruva drill permits may also require the approval of the federal Norwegian Environmental Agency in Oslo. Whilst precise timelines are not available, the Company currently expects drill permits to be granted immediately after the summer government recess. 

    Killero E Drill Holes – Locations and Technical Data

    Table 1. Technical data relating to Killero E drill holes completed.

    Hole

    East

    North

    Altitude

    Azi

    Dip

    Depth

    Core

    Comments

    KE-001

    406,631

    7,514,770

    203.6m

    145

    -45

    301.50m

    HQ

    Complete

    KE-001A

    406,627

    7,514,775

    203.0m

    145

    -55

    269.30m

    HQ

    Complete

    KE-001B

    406,627

    7,514,775

    203.0m

    180

    -45

    241.20m

    NQ

    Complete

    KE-002

    406,563

    7,514,516

    206.6m

    145

    -50

    83.10m

    NQ

    Complete

    KE-003

    406,487

    7,514,627

    202.7m

    145

    -45

    211.80m

    NQ

    Complete

    KE-004

    406,343

    7,514,484

    201.5m

    145

    -45

    50.50m

    NQ

    Abandoned*

    KE-005

    406,234

    7,514,248

    207.9m

    140

    -50

    250.65m

    NQ

    Complete

    KE-006

    406,129

    7,514,089

    204.0m

    170

    -45

    301.45m

    NQ

    Complete

    KE-007

    406,557

    7,514,874

    200.2m

    220

    -50

    298.70m

    NQ

    Complete







    Total





    2,008.20





    Footnotes: i) Datum used for Eastings ("East") and Northings ("North") is WGS84/UTM Zone 35N, ii) *KE-004 could not be completed as a result of a mechanical failure on the drill rig, iii) total metres completed in the program are updated to 2,008.20 (incorrectly stated as 1,946.85m in the Company's March 24, 2026 News Release).  

    Quality Assurance/Quality Control (QA/QC)

    Capella/Tümad implemented a Quality Assurance/Quality Control (QA/QC) program to ensure that logging and processing of the Killero E drill core was conducted in accordance with NI 43-101 standards and industry best practice. Drill core samples were either HQ (KE-001 and KE-001A) or NQ (KE-001B to KE-007) sized and were logged, photographed, and marked-up for sampling by geologists at GeoPool's dedicated logging facility in Sodankylä. Core sampling was undertaken at the same facility utilizing a diamond saw, with one half being dispatched to the analytical laboratory and the other half remaining in storage. Sample lengths were determined according to geology and range from <1m in mineralized intervals to 2m in unmineralized intervals.    

    Samples for analysis were then sealed in plastic bags and delivered to ALS Laboratories in Sodankylä for sample preparation and subsequent analysis. All samples were dried and crushed to 70% passing 2mm, with a 250g representative split then being taken and further pulverized to a pulp with 85% passing 75 microns (Code PREP-31Y). All pulps were subsequently analyzed for Au (30g Fire Assay with AA finish; Code Au-AA23) plus a 34-element package (4 acid digestion with ICP-AES/MS finish; Code ME-ICP61). Overlimit analyses of Cu were automatically undertaken using the (+)-OG62 analytical technique. Internal controls of analytical results were provided through a mix of Certified Reference Materials (standards), duplicates, and blanks inserted by both Capella/Tümad and ALS in to the analytical sequence.      

    Qualified Persons and Disclosure Statement

    The technical information presented in this news release has been prepared in accordance with Canadian regulatory requirements as set out in National Instrument 43-101 ("NI 43-101") and approved by Eric Roth, the Company's President & CEO, a Director, and a Qualified Person under NI 43-101.  Mr. Roth holds a Ph.D. in Economic Geology from the University of Western Australia, is a Fellow of the Australian Institute of Mining and Metallurgy (AusIMM) and is a Fellow of the Society of Economic Geologists (SEG). Mr. Roth has over 35 years of experience in international minerals exploration and mining project evaluation.

    On Behalf of the Board of Capella Minerals Ltd.

    "Eric Roth"

    ___________________________

    Eric Roth, Ph.D., FAusIMM

    President & CEO

    About Capella Minerals Ltd

    Capella is a Canadian exploration and development company with a focus on generating gold-copper projects globally.

    On January 15, 2026, Capella announced the signing of a Binding Letter of Intent with Verde Metals with respect to an Earn-In Agreement on the Solana Iron-Oxide Copper-Gold ("IOCG") project in southern Spain. Work plans for the Solana project are currently in the process of being approved by the Andalucian Mining Authority, with field activities expected to begin in early Q3, 2026.

    Capella announced on September 2, 2025, the signing of a Definitive Agreement with Turkish mining company, Tümad Madencilik Sanayi Ve Ticaret A.S. ("Tümad"), for a staged earn-in on the Company's portfolio of precious and base metal projects in Scandinavia. Tümad's minimum Year 1 investment commitment includes up to 12,000m of diamond drilling on the Company's gold-copper projects in the Central Lapland Greenstone Belt of northern Finland and the Hessjogruva copper-cobalt-zinc VMS project in central Norway.

    Capella also retains a carried 10% interest through to production on the Løkken copper-cobalt-zinc VMS project of central Norway through a partnership with Teako Minerals Corp. ("Teako"). In addition, Capella holds Net Smelter Royalties on the Savant Gold Project in Ontario, Canada (BeMetals Corp.) and the Central Finland Lithium Projects (Grit Metals Corp.), as a result of the divestiture of non-core assets.

    For additional information you are cordially invited to visit the Capella Minerals Ltd website at www.capellaminerals.com, or to contact Karen Davies, VP Communications and Corporate Development, at Tel: +1.604.314.2662.

    Cautionary Notes and Forward-looking Statements

    This news release contains forward-looking information within the meaning of applicable securities legislation. Forward-looking information is typically identified by words such as: believe, expect, anticipate, intend, estimate, postulate and similar expressions, or are those, which, by their nature, refer to future events. Such statements include, without limitation, statements regarding the future results of operations, performance and achievements of Capella, including the timing, completion of and results from the exploration and drill programs described in this release.  Although the Company believes that such statements are reasonable, it can give no assurances that such expectations will prove to be correct. All such forward-looking information is based on certain assumptions and analyses made by Capella in light of their experience and perception of historical trends, current conditions and expected future developments, as well as other factors management believes are appropriate in the circumstances. This information, however, is subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information. Important factors that could cause actual results to differ from this forward-looking information include those described under the heading "Risks and Uncertainties" in Capella's most recently filed MD&A. Capella does not intend, and expressly disclaims any obligation to, update or revise the forward-looking information contained in this news release, except as required by law. Readers are cautioned not to place undue reliance on forward-looking information.

    Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release.

    Capella Intersects Copper-Rich Massive Sulfide Mineralization in Vein Zones at the Killero E Project, Northern Finland (CNW Group/Capella Minerals Limited)

    Capella Minerals Ltd. logo (CNW Group/Capella Minerals Limited)

    SOURCE Capella Minerals Limited

    Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/June2026/24/c7179.html

    Get the next $AEM alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $AEM

    DatePrice TargetRatingAnalyst
    7/6/2026$200.00Hold → Buy
    Jefferies
    5/22/2026$213.00Overweight
    Barclays
    3/24/2026Buy → Hold
    Erste Group
    3/5/2026Hold → Buy
    Erste Group
    1/29/2026$248.00Neutral
    Analyst
    6/30/2025$130.00Outperform
    Raymond James
    4/16/2025$181.00Outperform
    BMO Capital Markets
    3/31/2025$100.00 → $110.00Buy → Neutral
    UBS
    More analyst ratings

    $AEM
    SEC Filings

    View All

    SEC Form 6-K filed by Agnico Eagle Mines Limited

    6-K - AGNICO EAGLE MINES LTD (0000002809) (Filer)

    7/2/26 11:39:31 AM ET
    $AEM
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by Agnico Eagle Mines Limited

    6-K - AGNICO EAGLE MINES LTD (0000002809) (Filer)

    6/29/26 12:03:37 PM ET
    $AEM
    Precious Metals
    Basic Materials

    SEC Form SD filed by Agnico Eagle Mines Limited

    SD - AGNICO EAGLE MINES LTD (0000002809) (Filer)

    6/1/26 2:32:06 PM ET
    $AEM
    Precious Metals
    Basic Materials

    $AEM
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    Agnico-Eagle Mines upgraded by Jefferies with a new price target

    Jefferies upgraded Agnico-Eagle Mines from Hold to Buy and set a new price target of $200.00

    7/6/26 8:48:59 AM ET
    $AEM
    Precious Metals
    Basic Materials

    Barclays initiated coverage on Agnico-Eagle Mines with a new price target

    Barclays initiated coverage of Agnico-Eagle Mines with a rating of Overweight and set a new price target of $213.00

    5/22/26 8:31:30 AM ET
    $AEM
    Precious Metals
    Basic Materials

    Agnico-Eagle Mines downgraded by Erste Group

    Erste Group downgraded Agnico-Eagle Mines from Buy to Hold

    3/24/26 12:31:36 PM ET
    $AEM
    Precious Metals
    Basic Materials

    $AEM
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    America Needs Antimony, and This Nevada Explorer Just Defined One of the Largest Domestic Resources of It

    Issued on behalf of NevGold Corp. NevGold Corp. (TSXV:NAU) (OTCQX:NAUFF) (Frankfurt: 5E50) has announced a maiden gold-antimony Mineral Resource Estimate at its Limousine Butte Project in Nevada, defining a large-scale, oxide antimony-gold resource in the United States with near-term production potential for a critical mineral the country urgently needs to source domestically. VANCOUVER, British Columbia, July 15, 2026 (GLOBE NEWSWIRE) -- Canada News Group News Commentary — Antimony is not a metal most investors think about, but the U.S. government thinks about it constantly. It hardens ammunition, it is essential to flame retardants and night-vision equipment, and it has no easy substit

    7/15/26 10:38:09 AM ET
    $UAMY
    $PPTA
    $AEM
    Metal Fabrications
    Industrials
    Precious Metals
    Basic Materials

    Capella Initiates Reconnaissance Diamond Drill Program at the Killero W Gold-Copper Project, Northern Finland

    VANCOUVER, BC, July 3, 2026 /CNW/ - Capella Minerals Ltd. (TSXV:CMIL) (OTC:CMILF) (FRA: N7D) ("Capella" or the "Company") is pleased to announce the commencement of a reconnaissance diamond drill program at the Killero W gold-copper project in the Central Lapland Greenstone Belt, Northern Finland. The Killero W project is one of five projects that form part of the Tümad Madencilik Sanayi Ve Ticaret A.S. ("Tümad") earn-in Joint Venture ("JV") for Northern Finland (see Company News Release dated September 2, 2025), with the current drill program at Killero W following on from the recently completed 2,008m / 9 hole diamond drill program at Killero E.The Northern Finland projects (Killero E, Kil

    7/3/26 8:59:00 AM ET
    $AEM
    Precious Metals
    Basic Materials

    A Fully Permitted Tanzanian Gold Project Just Took a Key Step Toward Construction

    Issued on behalf of Lake Victoria Gold Ltd. Lake Victoria Gold Ltd. (TSXV:LVG) (OTCQB:LVGLF) (FSE: E1K) received Tanzania Mining Commission approval for a Tanzanian-led engineering, procurement and construction management team at its fully permitted Imwelo Gold Project, consolidating development workstreams under a single delivery framework as the Company advances toward construction. VANCOUVER, British Columbia, July 02, 2026 (GLOBE NEWSWIRE) -- Canada News Group News Commentary — Gold has spent 2026 trading near record levels, and the rally has done more than lift the share prices of the world’s largest producers. It has sharpened investor attention on the smaller developers working to

    7/2/26 9:15:00 AM ET
    $NEM
    $B
    $AEM
    Precious Metals
    Basic Materials

    $AEM
    Financials

    Live finance-specific insights

    View All

    AGNICO EAGLE REPORTS WALL MOVEMENT AT BARNAT OPEN PIT AT CANADIAN MALARTIC

    Stock Symbol: AEM (NYSE and TSX)TORONTO, July 2, 2026 /CNW/ - Agnico Eagle Mines Limited (NYSE: AEM) (TSX:AEM) ("Agnico Eagle" or the "Company") reports that a rock mass movement occurred on July 1, 2026, along the north wall of the Barnat open pit at the Canadian Malartic complex in Quebec, Canada. There were no injuries, equipment damage or environmental impact as a result of the event. As a precautionary measure, the Company has temporarily suspended mining operations in the Barnat open pit.The rock mass movement occurred within an area that had been previously identified as having weaker geological structures within the north wall at Barnat and was subject to enhanced geotechnical monito

    7/2/26 7:47:00 AM ET
    $AEM
    Precious Metals
    Basic Materials

    AGNICO EAGLE PROVIDES NOTICE OF RELEASE OF SECOND QUARTER 2026 RESULTS AND CONFERENCE CALL

    Stock Symbol: AEM (NYSE and TSX)TORONTO, June 29, 2026 /CNW/ - Agnico Eagle Mines Limited (NYSE:AEM) (TSX:AEM) ("Agnico Eagle" or the "Company") today announced that it will release its second quarter 2026 results on Wednesday, July 29, 2026, after normal trading hours.Second Quarter 2026 Results Conference Call and WebcastAgnico Eagle's senior management will host a conference call on Thursday, July 30, 2026, at 11:00 AM (E.D.T.) to discuss the Company's financial and operating results.Via Webcast:To listen to the live webcast of the conference call, you may register on the Company's website at www.agnicoeagle.com, or directly via the link here.Via Phone:To join the conference call by phone

    6/29/26 7:30:00 AM ET
    $AEM
    Precious Metals
    Basic Materials

    Agnico Eagle and Rupert Resources Announce Closing of Arrangement

    Agnico Eagle Mines Limited (NYSE:AEM, TSX:AEM) ("Agnico Eagle") and Rupert Resources Ltd (TSX:RUP, OTCQX:RUPRF, FSE:R05)) ("Rupert") today announced the successful completion of the previously-announced plan of arrangement (the "Arrangement") under the provisions of the Business Corporations Act (British Columbia) pursuant to which, among other things, Agnico Eagle acquired all of the issued and outstanding common shares of Rupert (the "Shares") that it did not already own (the "Transaction"). Pursuant to the Arrangement, each Share was exchanged for: (i) 0.0401 of a common share of Agnico Eagle (the "Share Consideration"); and (ii) contingent consideration of up to C$3.00, in the form of

    6/16/26 11:12:00 AM ET
    $AEM
    Precious Metals
    Basic Materials

    $AEM
    Leadership Updates

    Live Leadership Updates

    View All

    A Fully Permitted Tanzanian Gold Project Just Took a Key Step Toward Construction

    Issued on behalf of Lake Victoria Gold Ltd. Lake Victoria Gold Ltd. (TSXV:LVG) (OTCQB:LVGLF) (FSE: E1K) received Tanzania Mining Commission approval for a Tanzanian-led engineering, procurement and construction management team at its fully permitted Imwelo Gold Project, consolidating development workstreams under a single delivery framework as the Company advances toward construction. VANCOUVER, British Columbia, July 02, 2026 (GLOBE NEWSWIRE) -- Canada News Group News Commentary — Gold has spent 2026 trading near record levels, and the rally has done more than lift the share prices of the world’s largest producers. It has sharpened investor attention on the smaller developers working to

    7/2/26 9:15:00 AM ET
    $NEM
    $B
    $AEM
    Precious Metals
    Basic Materials

    Financial Results for the Three Months Ending March 31, 2026

    Rupert Resources Ltd. (TSX:RUP, OTCQX:RUPRF, FSE: R05)) ("Rupert" or the "Company") is pleased to announce that it has published its unaudited financial results for the three months ending March 31, 2026 and accompanying Management's Discussion and Analysis for the same period. Both of the above have been posted on the Company's website www.rupertresources.com and on the Company's profile on SEDAR+ at www.sedarplus.ca. All references to currency in this press release are in Canadian dollars, unless specified otherwise. Q1 2026 HIGHLIGHTS In February 2026, Ausenco Engineering ("Ausenco") was appointed to lead the Ikkari Project Feasibility Study ("FS"). Updated guidance was also

    5/13/26 5:00:00 PM ET
    $AEM
    Precious Metals
    Basic Materials

    Yukon Metals Just Optioned a Sumitomo-Drilled Copper-Gold Project Next to Its Birch Discovery — Here's What's Now in Play in the Yukon

    Issued on behalf of Yukon Metals Corp. With 18 projects, 44,000 hectares, and a recent string of high-grade hits at Birch, Carter Gulch, and Star River, this Berdahl-family-backed junior is consolidating ground in a territory the majors are once again funding Key Takeaways Yukon Metals Corp. (CSE:YMC) (FSE: E770) (OTCQB:YMMCF) controls an 18-project, 44,000-hectare portfolio across the Yukon, built on more than 30 years of prospecting by the Berdahl family — the same team behind Snowline Gold's flagship Rogue Project [1,2].Hole BR25-003 at Birch — drilled 300 metres northeast of the discovery hole — returned 47.4 metres of 0.43 g/t gold including 1.0 metre of 14.35 g/t gold (Decembe

    5/12/26 11:45:00 AM ET
    $AEM
    $HL
    $NEM
    Precious Metals
    Basic Materials
    Mining & Quarrying of Nonmetallic Minerals (No Fuels)
    Industrials

    $AEM
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    SEC Form SC 13G/A filed by Agnico Eagle Mines Limited (Amendment)

    SC 13G/A - AGNICO EAGLE MINES LTD (0000002809) (Subject)

    2/4/22 2:59:35 PM ET
    $AEM
    Precious Metals
    Basic Materials

    SEC Form SC 13G/A filed

    SC 13G/A - AGNICO EAGLE MINES LTD (0000002809) (Subject)

    2/10/21 10:34:19 AM ET
    $AEM
    Precious Metals
    Basic Materials