• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    GoldMining Announces Updated PEA Highlighting $1.0 Billion After-Tax NPV and 32% IRR at La Mina Project, Colombia

    4/28/26 6:30:00 AM ET
    $GLDG
    Precious Metals
    Basic Materials
    Get the next $GLDG alert in real time by email

    DESIGNATED NEWS RELEASE

    VANCOUVER, BC, April 28, 2026 /CNW/ - GoldMining Inc. (TSX:GOLD) (NYSE:GLDG) (the "Company" or "GoldMining") is pleased to announce the results of an updated preliminary economic assessment ("PEA") on the La Mina Project (the "Project"), located in Antioquia, Colombia. 

    All currency amounts herein are in US dollars unless otherwise indicated.

    PEA Highlights1

    • Enhanced Project Value: The updated PEA incorporates current bench-marked costs and updated base case pricing of $3,500 /oz gold (Au), $4.70/lb copper (Cu) and $40/oz silver (Ag), resulting in a 265% increase in after-tax net present value at 5% discount rate ("NPV5%") from the prior PEA disclosed by the Company for the Project.
    • Strong Base Case Economics: After-tax NPV5% of $1.0 billion and an after-tax internal rate of return ("IRR") of 32.2% and initial payback of approximately 2.7 years.
    • Leverage to Spot Prices: At current spot prices (approximately, $4,775/oz Au, $5.75/lb Cu, and $77/oz Ag), the after-tax NPV5% increases to approximately $1.8 billion with an IRR of 49.1% and initial payback of 1.9 years.
    • High Capital Efficiency: Initial capital expenditures are estimated at $523 million, representing an attractive 0.5x initial capital to base case NPV5% ratio that highlights the Project's potential for a compelling return on investment.
    • Strong Production Profile: Average annual production of 152.4 koz Au equivalent ("AuEq") over the first five years of operation, and total life of mine ("LOM") production of 1.5 Moz AuEq (comprising 1.2 Moz Au, 2.6 Moz Ag, and 195 Mlbs Cu) over an 11.2 year projected mine life.
    • Resilient Cost Profile: Estimated total cash cost of $872/oz Au and All-In Sustaining Cost ("AISC") of $1,045/oz Au (calculated on a by-product basis).
    • Conventional Operation: The PEA contemplates a conventional open-pit truck-and-shovel operation and a processing rate of 15,000 tonnes per day ("tpd"). A proven processing flowsheet utilizing standard froth flotation and leach circuits achieves high metallurgical recoveries of 91% Au, 80% Cu, and 64% Ag.
    • Significant Portfolio Potential: On a gold equivalent basis, the estimated mineral resources contained in the La Mina PEA account for approximately 9% of the Company's global Measured and Indicated Resources and 16% of the Inferred Resources (refer to the Company's Annual Information Form dated February 27, 2026).

    Alastair Still, CEO of GoldMining commented, "The updated Project PEA highlights the underlying quality of the La Mina porphyry gold-copper mineral system and represents just a small portion of and emphasizes the depth of the GoldMining portfolio of projects that we continue to advance. By capturing current market consensus metals pricing, the PEA conceptualizes a robust $1.0 billion base case project that is characterized with an efficient capital intensity. We're not simply adjusting for the higher commodity prices; we have confirmed that La Mina is potentially a resilient development opportunity. With these solid base case economics, which improve substantially at spot prices, the Company is excited by the opportunity to further advance and de-risk the Project on the path towards potential future development."

    1 The gold equivalent equations are: AuEq(oz) = Au (g/t) + [Cu(%) x {Cu Price/Au Price} x 22.0462 x 31.1035] + [Ag (g/t) x {Ag Price/Au Price}]. AISC includes mining costs, processing costs, royalties, G&A costs, transportation costs, sustaining capital and closure costs less by-product credits.

    Table 1: Summary of La Mina PEA Production Metrics

    La Mina PEA Key Metrics





    Production

    Result

    Units

    Mine life

    11.2

    Years

    LOM Strip ratio (waste:processed material)

    5.49

    Ratio

    Total mined material

    398.4

    Mt

    Total processed material

    61.3

    Mt

    Nominal process plant rate

    15,000

    tpd

    Gold Production





    Average gold feed grade

    0.72

    g/t

    Average gold metallurgical recovery

    91

    %

    Total gold produced

    1,243.3

    koz

    Average annual gold production                                          (Years 1-5)

    125.8

    koz

    LOM

    107.7

    koz

    Copper Production





    Average copper feed grade

    0.19

    %

    Average copper metallurgical recovery

    80

    %

    Total copper production

    195.0

    Mlbs

    Average annual copper production                                      (Years 1-5)

    22.4

    Mlbs

    LOM

    17.0

    Mlbs

    Silver Production





    Average silver feed grade

    2.36

    g/t

    Average silver metallurgical recovery

    64

    %

    Total silver production

    2,572.7

    koz

    Average annual silver production                                         (Years 1-5)

    273.1

    koz

    LOM

    248.6

    koz

    Gold Equivalent Production1





    Average gold equivalent feed grade

    0.92

    g/t

    Total gold equivalent produced

    1,534.6

    koz

    Average annual gold equivalent production                         (Years 1-5)

    152.4

    koz

    LOM

    137.0

    koz

    Numbers may not add due to rounding.

    (1) The gold equivalent equations are: AuEq(oz) = Au (g/t) + [Cu(%) x {Cu Price/Au Price} x 22.0462 x 31.1035] + [Ag (g/t) x {Ag Price/Au Price}]

    The PEA is preliminary in nature, and there is no certainty that the reported results will be realized. The PEA includes Inferred Mineral Resources, which are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves. There is no certainty that this PEA, including the conceptual economics set out therein, will be realized.

    Table 2: Summary of La Mina PEA Financial Metrics

    La Mina PEA Key Financial Metrics





    Metal Prices

    Base Case

    Spot Price

    Gold ($/oz)

    3,500

    4,775

    Copper ($/lb)

    4.70

    5.75

    Silver ($/oz)

    40

    77

    Operating Costs (OPEX)

    Result

    Units

    Mining unit cost

    1.94

    12.62

    $/t mined

    $/t milled

    Process unit cost

    14.90

    $/t milled

    General and Administrative (G&A) unit cost

    0.66

    $/t milled

    Off-site operating cost

    1.32

    $/t milled

    Total OPEX

    29.50

    $/t milled

    Total Cash cost (by-product basis) 1

    872

    $/oz Au

    AISC (by-product basis) 2

    1,045

    $/oz Au

    Capital Expenditures (CAPEX)

    Result

    Units

    Initial capital expenditure (includes pre-strip)

    523.3

    $M

    Sustaining capital expenditure

    166.0

    $M

    Closure costs

    49.8

    $M

    Total Capital

    739.1

    $M

    Base Case Economics

    Result

    Units

    Net present value (NPV5%) – pre-tax

    1,613.9

    $M

    Internal rate of return (IRR) – pre-tax

    45.2 %

    %

    Net present value (NPV5%) – after-tax

    1,001.5

    $M

    Internal rate of return (IRR) – after-tax

    32.2

    %

    Payback – after-tax

    2.7

    Years

    Spot Price Economics

    Result

    Units

    Net present value (NPV5%) – pre-tax

    2,848.7

    $M

    Internal rate of return (IRR) – pre-tax

    68.7 %

    %

    NPV5% – after-tax

    1,804.1

    $M

    IRR – after-tax

    49.1

    %

    Payback – after-tax

    1.9

    Years

    Numbers may not add due to rounding.

    (1) Total Cash Costs consist of mining costs, processing costs, royalties, general administrative, and transportation costs, less by-product credits.

    (2) AISC includes Total Cash Costs plus sustaining capital and closure costs, less by-product credits.

    Base Case assumes $3,500/oz Au, $4.70/lb Cu, and $40/oz Ag.

    Spot Price assumes $4,775/oz Au, $5.75/lb Cu, and $77/oz Ag.

    La Mina PEA Summary

    The PEA reviewed and refined mine engineering design work completed during the previous (2023) preliminary economic assessment disclosed by the Company, including updating all operating and capital cost estimates following a comprehensive review of technical inputs, and updating metal price assumptions. No other substantive changes were made during the study.

    The Project, covering 3,208 hectares, is located in the Department of Antioquia, Republic of Colombia, approximately 51 km southwest of Medellin. The Mineral Resource Estimate ("MRE") for La Mina includes the La Cantera, La Garrucha, and Middle Zone porphyry deposits, which are located within 1,000 meters of each other. No additional drilling has been completed at La Mina in support of this updated PEA, therefore the current MRE with effective date December 20th, 2022, remains current in support of the PEA.  

    The PEA considers a conventional drill, blast, load, and haul open pit operation mining an average of 97,000 tpd over the 11.2 year life of mine. It contemplates that resources will be processed at a nominal rate of 15,000 tpd by conventional grinding and flotation to generate a copper concentrate, with tailings of the copper process reporting to a leach circuit to generate gold-silver doré on site. The combined LOM average metallurgical recovery of 91%, 80% and 64% are realized for gold, copper and silver, respectively.

    The PEA includes on-site development including mining, haul roads, access roads, process facilities, tailings and waste storage facilities, and related ancillary facilities. Construction is anticipated to take approximately two years with an initial capital expenditure of $523.3 million with operations continuing for 11.2 years.  Sustaining capital expenditures over the LOM are expected to be approximately $166 million, consisting of a mix of mining capital equipment and staged expansion of the tailings and waste facilities. LOM operating costs are expected to average $29.50/t of material processed.

    Under the PEA, highest metal production occurs in the initial five years of production averaging 152.4 koz AuEq comprising 126 koz Au, 22.4 Mlbs Cu, and 273 koz Ag annual production. Year 1 production of 176.5 koz AuEq comprises 138 koz Au, 27.0 Mlbs Cu, and 174.8 koz Ag. LOM average production is 137.0 koz AuEq, comprising 107.7 koz Au, 17.0 Mlbs Cu, and 248.6 koz Ag.

    The LOM average mining rate in the PEA is 5.5 Mt resources per annum and 30.1 Mt waste, which equates to an average LOM strip ratio of 5.5:1.

    Table 3: Capital Breakdown



    Initial ($M)

    Sustaining ($M)

    Total ($M)

    Contractor Pre-Strip

    11.4

    46.4

    57.9

    Mining Equipment

    80.5

    81.2

    161.8

    Process Plant

    224.7

    5.0

    229.7

    Site

    65.0

    -

    65.0

    Tailing Storage Facility Initial

    6.0

    5.6

    11.6

    Owner's Cost

    58.1

    -

    58.1

    Contingency

    77.5

    27.7

    105.2

    Sub-total Capital

    523.3

    166.0

    689.3

    Mine Closure



    49.8

    49.8

    Total Capital

    523.3

    215.7

    739.1

    Numbers may not add due to rounding

    Figure 1: Metal Production Schedule - The gold equivalent equations are: AuEq(oz) = Au (g/t) + [Cu(%) x {Cu Price/Au Price} x 22.0462 x 31.1035] + [Ag (g/t) x {Ag Price/Au Price}] (CNW Group/GoldMining Inc.)

    Figure 2: Process Schedule - The gold equivalent equations are: AuEq(oz) = Au (g/t) + [Cu(%) x {Cu Price/Au Price} x 22.0462 x 31.1035] + [Ag (g/t) x {Ag Price/Au Price}] (CNW Group/GoldMining Inc.)

    Mineral Resource Estimate

    The PEA is based on the Mineral Resource estimate set forth in the Company's previous technical report titled "NI 43-101 Technical Report and Preliminary Economic Assessment For The La Mina Project, Antioquia, Republic of Colombia" dated effective July 24, 2023. There has been no material change in such Mineral Resource estimate for the Project. For the purpose of this PEA, such was reviewed by the Qualified Person under the PEA and deemed to remain valid and effective.

    TABLE 4: Pit Constrained Mineral Resource Estimate (Effective Date: December 20, 2022)





    Grades

    Contained Metal

    Deposit

    Tonnes

    Au

    Ag

    Cu

    AuEq

    Au

    Ag

    Cu

    AuEq



    (kt)

    (g/t)

    (g/t)

    ( %)

    (g/t)

    (koz)

    (koz)

    (Mlbs)

    (koz)

    Indicated Mineral Resource

    La Cantera

    17,614

    0.86

    2.03

    0.31

    1.32

    487

    1,150

    120

    753

    La Garrucha

    7,358

    0.65

    3.14

    0.11

    0.84

    154

    743

    18

    201

    Middle Zone

    8,800

    0.54

    1.28

    0.11

    0.71

    153

    362

    21

    201

    Total Indicated

    33,772

    0.73

    2.08

    0.21

    1.06

    794

    2,255

    159

    1,150

    Inferred Mineral Resource

    La Cantera

    11,175

    0.71

    1.85

    0.30

    1.15

    255

    665

    73

    413

    La Garrucha

    44,107

    0.55

    2.46

    0.10

    0.72

    780

    3,488

    97

    1,020

    Middle Zone

    949

    0.47

    1.15

    0.09

    0.61

    14

    35

    2

    19

    Total Inferred

    56,231

    0.58

    2.32

    0.14

    0.80

    1,049

    4,188

    171

    1,454

    Notes:

    1.

    The qualified person for the above estimate is Scott Wilson, C.P.G, SME.

    2.

    Mineral Resources are classified as Indicated Resources and Inferred Resources and are based on the 2014 CIM Definition Standards. The estimation of Indicated Mineral Resources involves greater uncertainty as to their existence and economic feasibility than the estimation of Mineral Reserves, and therefore investors are cautioned not to assume that all or any part of Indicated Mineral Resources will ever be converted into Mineral Reserves. The estimation of Inferred Mineral Resources involves greater uncertainty as to their existence and economic viability than the estimation of other categories of Mineral Resources.

    3.

    Numbers may not add up due to rounding.

    4.

    Cut-Off Grade: 0.30 g/t Au.

    5.

    The Mineral Resource Estimate was based on US$ metal prices of $3.50/lb Cu, $1,700/oz Au and $21/oz Ag.

    6.

    Gold-equivalent grades were calculated using the following formula: AuEq = Au (g/t) + [Cu(%) x {Cu Price/Au Price} x 22.0462 x 31.1035] + [Ag (g/t) x {Ag Price/Au Price}].

    7.

    The quantity and grade of reported Inferred Mineral Resources in this estimation are uncertain in nature and there has been insufficient exploration to define these Inferred Mineral Resources as Indicated or Measured Mineral Resources.

    8.

    There are no known environmental, permitting, legal, title, taxation, socio-economic, marketing, political or other relevant factors that may materially affect the Mineral Resource Estimate. 

    For a description of the data verification, assay procedures and the quality assurance program and quality control measures applied by the Company, please see the Company's Annual Information Form for the year ended November 30, 2025, filed under the Company's profile on SEDAR+ at www.sedarplus.ca. Further information about the PEA referenced in this news release, including information in respect of data verification, key assumptions, parameters, risks and other factors, will be contained in a technical report, which will be filed by the Company in respect of the PEA within 45 days under its profile at SEDAR+ at www.sedarplus.ca.

    Opportunities

    This new PEA highlights strong potential for the advancement of the Project and sets out several opportunities for future study which may further enhance project value, including:

    Opportunity

    Potential Benefits









    Infill Drilling

    Increase confidence in the geological models and controls on and

    interpolation of grade; may increase resource grade overall and

    convert mineral resources to higher categories.









    Exploration Drilling

    Expansion opportunities at the existing deposits to delineate

    additional resources.









    Exploration drilling outside of the

    current resources

    Porphyry cluster model predicts potential for new porphyry discoveries

    within the existing La Mina district-scale land package.









    Metallurgical test work & Process

    design

    Variability test work to optimize process flowsheet and improve gold,

    copper, and silver recoveries.









    Geotechnical test work

    Optimize pit wall slopes and potentially reduce strip ratio and to assess

    potential waste rock and tailings storage sites.









    Infrastructure design & Scheduling

    Optimize site layout, material handling and pit backfill to reduce LOM

    operating costs.









    Environmental & Sustainability

    Governance (ESG)

    Environmental baseline & heritage studies, and community stakeholder

    engagement to inform the local community about the potential mining

    opportunity and economic benefits.









    Qualified Persons

    The PEA was prepared for the Company by Scott E. Wilson, CPG, Zeke Blakeley, SME-RM, and Rick Jordan, SME-RM, each of which is independent of the Company and a Qualified Person, as such term is defined in NI 43-101. The specific sections of the technical report for which each such Qualified Person is responsible will be set out in the technical report relating to the PEA.  Each such Qualified Person has reviewed and approved the scientific and technical information regarding the PEA as disclosed in this news release.

    Imola Götz, M.Sc. P.Eng., F.E.C., Vice President, Project Development of the Company and a Qualified Person, as such term is defined in NI 43-101, has supervised the preparation of this news release and has reviewed and approved the scientific and technical information contained herein.

    About GoldMining Inc.

    GoldMining Inc. is a public mineral exploration company focused on acquiring and developing gold assets in the Americas. Through its disciplined acquisition strategy, GoldMining now controls a diversified portfolio of resource-stage gold and gold-copper projects in Canada, the U.S.A., Brazil, Colombia, and Peru.

    Notice to Readers

    Disclosure regarding the Project, including the PEA and Mineral Resource estimates included herein, has been prepared by the Company in accordance with NI 43-101. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for public disclosure by issuer of scientific and technical information concerning mineral projects. NI 43-101 differs significantly from the disclosure requirements of the United States Securities and Exchange Commission ("SEC") generally applicable to U.S. companies subject to the SEC's disclosure requirements. For example, the terms "Indicated Mineral Resource" and "Inferred Mineral Resource" are defined in NI 43-101 by reference to the guidelines set out in the CIM Definition Standards on Mineral Resources and Mineral Reserves. Accordingly, information contained herein or in the Company's descriptions of its projects may not be comparable to similar information made public by U.S. companies reporting pursuant to SEC disclosure requirements.

    Investors are cautioned not to assume that all or any part of "Measured" or "Indicated" Mineral Resource will ever be converted into "reserves". Investors should also understand that "Inferred Mineral Resources" have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. Under Canadian rules, estimated "Inferred Mineral Resources" may not form the basis of feasibility or pre-feasibility studies except in rare cases. 

    For further information regarding the Company's projects and the resource estimates disclosed herein, please refer to the Company's most recent Annual Information Form and the technical reports filed under the Company's profile at www.sedarplus.ca and www.sec.gov.

     Forward-Looking Statements

    Certain of the information contained in this news release constitutes "forward-looking information" and "forward-looking statements" within the meaning of applicable Canadian and U.S. securities laws ("forward-looking statements"), which involve known and unknown risks, uncertainties and other factors that may cause the Company's actual results, performance and achievements to be materially different from the results, performance or achievements expressed or implied therein. Forward-looking statements, which are all statements other than statements of historical fact, include, but are not limited to the results of the PEA, the Company's plans and expectations regarding future opportunities and proposed work at the Project and the Company's other plans and expectations regarding the Project. Forward-looking statements are based on the then-current expectations, beliefs, assumptions, estimates and forecasts about the business and the markets in which GoldMining operates. Investors are cautioned that all forward-looking statements involve risks and uncertainties, including: the inherent risks involved in the exploration and development of mineral properties, fluctuating metal prices, unanticipated costs and expenses, risks related to government and environmental regulation, social, permitting and licensing matters, and uncertainties relating to the availability and costs of financing needed in the future. These risks, as well as others, including those set forth in GoldMiningꞌs Annual Information Form for the year ended November 30, 2025, and other filings with Canadian securities regulators and the SEC, could cause actual results and events to vary significantly. Accordingly, readers should not place undue reliance on forward-looking statements. There can be no assurance that forward-looking statements, or the material factors or assumptions used to develop such forward-looking statements, will prove to be accurate. The Company does not undertake to update any forward-looking statements, except in accordance with applicable securities law.

    GoldMining Inc. Logo (CNW Group/GoldMining Inc.)

    Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/goldmining-announces-updated-pea-highlighting-1-0-billion-after-tax-npv-and-32-irr-at-la-mina-project-colombia-302755073.html

    SOURCE GoldMining Inc.

    Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/April2026/28/c8128.html

    Get the next $GLDG alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $GLDG

    DatePrice TargetRatingAnalyst
    11/9/2021$6.00 → $6.25Buy
    HC Wainwright & Co.
    8/30/2021$5.75 → $6.00Buy
    HC Wainwright & Co.
    More analyst ratings

    $GLDG
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    HC Wainwright & Co. reiterated coverage on GoldMining with a new price target

    HC Wainwright & Co. reiterated coverage of GoldMining with a rating of Buy and set a new price target of $6.25 from $6.00 previously

    11/9/21 5:59:33 AM ET
    $GLDG
    Precious Metals
    Basic Materials

    HC Wainwright & Co. reiterated coverage on GoldMining with a new price target

    HC Wainwright & Co. reiterated coverage of GoldMining with a rating of Buy and set a new price target of $6.00 from $5.75 previously

    8/30/21 6:02:26 AM ET
    $GLDG
    Precious Metals
    Basic Materials

    Roth Capital reiterated coverage on GoldMining with a new price target

    Roth Capital reiterated coverage of GoldMining with a rating of Buy and set a new price target of $3.30 from $3.20 previously

    6/2/21 12:36:12 PM ET
    $GLDG
    Precious Metals
    Basic Materials

    $GLDG
    SEC Filings

    View All

    SEC Form 6-K filed by GoldMining Inc.

    6-K - GoldMining Inc. (0001538847) (Filer)

    5/26/26 6:32:25 AM ET
    $GLDG
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by GoldMining Inc.

    6-K - GoldMining Inc. (0001538847) (Filer)

    5/14/26 9:50:03 PM ET
    $GLDG
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by GoldMining Inc.

    6-K - GoldMining Inc. (0001538847) (Filer)

    4/28/26 6:40:45 AM ET
    $GLDG
    Precious Metals
    Basic Materials

    $GLDG
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    View All

    SEC Form 4 filed by Goldmining Inc.

    4 - GoldMining Inc. (0001538847) (Reporting)

    5/23/23 9:15:51 PM ET
    $GLDG
    Precious Metals
    Basic Materials

    SEC Form 4 filed by Goldmining Inc.

    4 - GoldMining Inc. (0001538847) (Reporting)

    5/12/23 8:04:33 PM ET
    $GLDG
    Precious Metals
    Basic Materials

    SEC Form 4 filed by Goldmining Inc.

    4 - GoldMining Inc. (0001538847) (Reporting)

    5/5/23 8:43:26 PM ET
    $GLDG
    Precious Metals
    Basic Materials

    $GLDG
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    GoldMining Commences 2026 Exploration Drilling Program at its Yarumalito Gold-Copper Project, Colombia

    VANCOUVER, BC, May 26, 2026 /CNW/ - GoldMining Inc. (TSX:GOLD) (NYSE:GLDG) (the "Company" or "GoldMining") is pleased to announce that it has commenced an exploration-focused core drilling program on its 100%-owned Yarumalito Gold-Copper Project ("Yarumalito" or the "Project") in the Mid Cauca gold-copper belt of Antioquia, Colombia.Highlights:Fully Funded Drill Program Underway: The diamond core drill is actively turning on site for an approximate 1,200-metre systematic program.Testing a New and Enhanced Geological Model: Drilling will follow-up on high priority targets previously identified through comprehensive relogging of historical core.Expanding the Mineralized P-1 Porphyry: Testing n

    5/26/26 6:30:00 AM ET
    $GLDG
    Precious Metals
    Basic Materials

    GoldMining Announces 2026 Annual Meeting Voting Results

    VANCOUVER, BC, May 14, 2026 /CNW/ - GoldMining Inc. (TSX:GOLD) (NYSE:GLDG) (the "Company" or "GoldMining") is pleased to announce that shareholder voting at the Company's annual meeting of shareholders (the "Meeting") held on May 14, 2026, has resulted in the election of all of the directors listed as nominees in management's information circular dated March 23, 2026.A quorum of 27.04% of the votes attached to the outstanding shares of the Company was present in person or by proxy at the Meeting.Each of the following six nominees proposed by management was elected as a director. The results of such vote were as follows:DirectorTotal Votes ForTotal Votes% of Votes ForAmir Adnani25,742,48028,0

    5/14/26 8:53:00 PM ET
    $GLDG
    Precious Metals
    Basic Materials

    Five Junior Gold Explorers Advancing Projects Adjacent to Major Mining Operations

    Issued on behalf of Golden Goose Resources Corp.VANCOUVER, BC, May 8, 2026 /CNW/ -- Equity-Insider.com News Commentary — The gold sector just posted a striking contradiction. Exploration budgets climbed 11% to US$6.2 billion last year, now accounting for half of all global mining exploration, yet the money chasing new grassroots discoveries fell to a record low of just 21% of total allocations[1]. In practical terms, the industry is spending more than ever on gold while finding less of it. Investment demand has now overtaken fabrication for the first time this cycle, tightening the window for undervalued juniors with district-scale ground in proven belts[2]. Five explorers sitting inside pro

    5/8/26 10:17:00 AM ET
    $GLDG
    $NVA
    Precious Metals
    Basic Materials

    $GLDG
    Leadership Updates

    Live Leadership Updates

    View All

    GoldMining Announces 2026 Annual Meeting Voting Results

    VANCOUVER, BC, May 14, 2026 /CNW/ - GoldMining Inc. (TSX:GOLD) (NYSE:GLDG) (the "Company" or "GoldMining") is pleased to announce that shareholder voting at the Company's annual meeting of shareholders (the "Meeting") held on May 14, 2026, has resulted in the election of all of the directors listed as nominees in management's information circular dated March 23, 2026.A quorum of 27.04% of the votes attached to the outstanding shares of the Company was present in person or by proxy at the Meeting.Each of the following six nominees proposed by management was elected as a director. The results of such vote were as follows:DirectorTotal Votes ForTotal Votes% of Votes ForAmir Adnani25,742,48028,0

    5/14/26 8:53:00 PM ET
    $GLDG
    Precious Metals
    Basic Materials

    GoldMining Appoints Imola Götz as Vice President, Project Development

    VANCOUVER, BC, March 5, 2026 /CNW/ - GoldMining Inc. (the "Company" or "GoldMining") (TSX:GOLD) (NYSE:GLDG) is pleased to announce the appointment of Imola Götz as Vice President, Project Development. Ms. Götz is a veteran mining engineer with over 30 years of international experience in both underground and open-pit mining environments including in world renowned northern Ontario gold mining camps of Hemlo and Timmins. Prior to joining the company, Ms. Götz held progressive leadership roles at Goldcorp, Newmont, Eldorado Gold, Sandstorm Gold Royalties, Horizon Copper, and most

    3/5/26 6:30:00 AM ET
    $GLDG
    Precious Metals
    Basic Materials

    GoldMining Appoints Martin Dumont as VP, Corporate Development and Investor Relations

    VANCOUVER, BC, Jan. 22, 2026 /PRNewswire/ - GoldMining Inc. (the "Company" or "GoldMining") (TSX:GOLD, NYSE:GLDG) is pleased to announce the appointment of Martin Dumont as Vice President, Corporate Development & Investor Relations. Alastair Still, President & Chief Executive Officer of GoldMining commented: "We are pleased to welcome Martin to the GoldMining team. His mining industry experience across corporate development, capital markets, and investor relations within the gold sector will play a key role as we continue to advance our portfolio and pursue value-accretive opp

    1/22/26 6:30:00 AM ET
    $GLDG
    $GROY
    $USGO
    Precious Metals
    Basic Materials

    $GLDG
    Financials

    Live finance-specific insights

    View All

    GoldMining Acquires Existing NSR Royalty on Its Yarumalito Project, Colombia

    VANCOUVER, BC, March 14, 2022 /PRNewswire/ - GoldMining Inc. (the "Company" or "GoldMining") (TSX:GOLD) (NYSE:GLDG) is pleased to announce that it has acquired an existing 1% net smelter return ("NSR") royalty on the Company's Yarumalito Project in Colombia from Newrange Gold Corp. ("Newrange"). Pursuant to the agreement, the Company paid Newrange CAD$100,000 in cash and delivered 10,000 common shares of the Company. Alastair Still, CEO of GoldMining, commented, "Yarumalito was acquired by the Company in 2019 as part of a strategic consolidation of three projects in the Mid Cauca Belt of Colombia that form a district-scale property package in one of the underexplored gold-copper belts in the

    3/14/22 7:00:00 AM ET
    $GLDG
    $GROY
    Precious Metals
    Basic Materials

    $GLDG
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    SEC Form SC 13G/A filed by GoldMining Inc. (Amendment)

    SC 13G/A - GoldMining Inc. (0001538847) (Subject)

    2/5/24 6:06:01 PM ET
    $GLDG
    Precious Metals
    Basic Materials

    SEC Form SC 13D filed by GoldMining Inc.

    SC 13D - GoldMining Inc. (0001538847) (Filed by)

    4/27/23 9:17:22 PM ET
    $GLDG
    Precious Metals
    Basic Materials

    SEC Form SC 13G/A filed by GoldMining Inc. (Amendment)

    SC 13G/A - GoldMining Inc. (0001538847) (Subject)

    2/14/23 1:05:49 PM ET
    $GLDG
    Precious Metals
    Basic Materials