• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    INTEGRA ANNOUNCES FIRST QUARTER PRODUCTION RESULTS FROM THE FLORIDA CANYON MINE AND STRENGTHENED BALANCE SHEET

    4/23/26 4:05:00 PM ET
    $ITRG
    Precious Metals
    Basic Materials
    Get the next $ITRG alert in real time by email

    TSXV: ITR; NYSE American: ITRG 

    www.integraresources.com

    VANCOUVER, BC, April 23, 2026 /CNW/ - Integra Resources Corp. ("Integra" or the "Company") (TSXV:ITR) (NYSE:ITRG) is pleased to provide an interim operational update for the first quarter ended March 31, 2026 (the "first quarter 2026" or "Q1 2026") highlighting continued operational momentum, record mining rates, and a strengthened balance sheet.

    Integra Resources Logo (CNW Group/Integra Resources Corp.)

    The Company plans to release its first quarter 2026 financial results after market close on Monday May 11, 2026, followed by a conference call hosted by senior management on Tuesday, May 12, 2026 at 11:00 AM Eastern Time / 8:00 AM Pacific Time. 

    (All amounts in United States ("U.S.") dollars as at March 31, 2026, unless otherwise stated.)

    Q1 2026 Operational Highlights:

    • The Company mined 3.0 million ("M") tonnes of ore and 3.9 M tonnes of waste at a strip ratio of 1.30 at the Florida Canyon Mine ("Florida Canyon" or the "Mine"). As a result, mining rates averaged 76,800 total tonnes per day ("tpd") which is a record for the Mine and its operations. 
    • The Florida Canyon Mine produced 12,635 ounces of gold and sold 12,518 ounces of gold in the quarter.
    • The Company commissioned six new Caterpillar 785 haul trucks during the quarter, materially enhancing mining capacity and supporting higher sustained mining rates going forward.
    • The Company raised $61 M through a bought deal public offering in Q1 2026 significantly strengthening the Company's balance sheet and funding near-term growth initiatives at the DeLamar Project (the "DeLamar Project" or "DeLamar"). Net proceeds are expected to be used to commence pre-production expenditures at the DeLamar Project and funded the acquisition of a strategic land position near the DeLamar Project.

    George Salamis, President, CEO and Director of Integra commented:

    "The first quarter of 2026 marked a period of strong operational progress at Florida Canyon, with record mining rates and the successful ramp-up of our Phase IIIB leach pad. While gold production in the quarter reflects temporary constraints, the deferred ounces are expected to be recovered over the balance of the year. Importantly, with these gold ounces expected to be recovered over the balance of the year, we maintained our full-year production guidance, underscoring our confidence in the operation and the improvements we have made to the Mine. In parallel, we significantly strengthened our balance sheet through a $61 M financing and continued to invest in both sustaining capital at Florida Canyon and the advancement of DeLamar. We believe these investments position Integra for a stronger second half of 2026 and reinforce our strategy of building a sustainable, multi-asset gold producer."

    Florida Canyon: Demonstrating Strong Operational Momentum with Record Mining Rates





    Three months ended

    March 31,



    Unit (1)

    2026

    Ore mined

    Kt

    3,008

    Waste mined

    Kt

    3,902

    Strip ratio

    waste/ore

    1.30

    Ore direct to leach pads

    Kt

    1,074

    Ore crushed

    Kt

    1,784

    Total ore to leach pads

    Kt

    2,858

    Processed grade

    g/t Au

    0.19

    Gold recovery rate

    %

    59.9 %

    Gold produced

    Oz

    12,635

    Gold sold

    Oz

    12,518

    Silver produced

    Oz

    11,622

    Silver sold

    Oz

    11,466

    (1)

    Unit abbreviations: kt = 1,000 metric tonnes, g/t = grams per tonne, Au = gold, oz = troy ounce

    (2)

    Ore milled includes material from stockpiles and ore mined.

    Florida Canyon produced 12,635 ounces of gold in the first quarter 2026, with approximately 3,000 ounces deferred due to temporarily reduced solution flow rates to a specific Phase II leach pad cell. The cell contains fine ore from the newly opened N2 pit, and a blending strategy has been developed to maintain nominal leach rates for this fine material. With this approach, together with the ramp up of the Phase IIIB leach pad, the Company expects to meet its annual gold production guidance of 70,000 to 75,000 ounces, with the majority of deferred first quarter ounces expected to be recovered through ongoing leaching over the remainder of 2026.

    Mining activities at Florida Canyon during the first quarter 2026 increased significantly, achieving a record mining rate of 76,800 total tonnes per day and positioning the operation to deliver improved operational flexibility and production consistency in future quarters. This increase was driven by the addition of the six Caterpillar 785 haul trucks commissioned during the quarter, completing the expansion of the fleet since 2025 to include eight Caterpillar 785 haul trucks, one Caterpillar 992HL loader and one Hitachi EX3600 front shovel. With increased haulage capacity and an enhanced mining fleet, the operation is better equipped to manage the historical waste stripping inherited from prior operators.

    The Company expects production to trend higher through the balance of 2026 as mining rates remain elevated and leach pad performance continues to normalize.

    First Quarter 2026 Consolidated Financial Position: Strengthened Balance Sheet Supports Growth and Development Pipeline

    Consolidated Financial Position

    Unit (1)

    March 31, 2026

    Cash and cash equivalents

    $000s

    $105,635

    (1)

    Unit abbreviations: $000s = thousands of U.S. dollars

    The Company significantly strengthened its cash position in Q1 2026, primarily driven by a $61 M bought deal public offering in February 2026 and positive operating earnings from Florida Canyon. Proceeds from the offering are being used to fund pre-production expenditures at the DeLamar Project and funded the acquisition of a strategic land position near the DeLamar Project in February 2026. This strengthened financial position provides Integra with the flexibility to continue optimizing Florida Canyon while advancing DeLamar without compromising balance sheet discipline.

    The first quarter of 2026 continued to mark a capital-intensive period across the Company's portfolio of assets with several key activities during the quarter. These investments reflect a deliberate focus on de-risking the portfolio and positioning the Company for sustainable production growth:

    • Florida Canyon: Approximately $12 M was allocated to sustaining and non-sustaining capital including capitalized waste stripping and initial cash payments on new mining equipment.
    • DeLamar and Nevada North: Approximately $5 M was allocated towards project expenses such as engineering and permitting work.
    • DeLamar pre-production and de-risking activities: Approximately $16.5 M was allocated towards de-risking activities, including a $3.4 M initial deposit to Idaho Power, and $12.5 M spent to acquire a strategic land position near the DeLamar Project.

    The financial information presented above is preliminary in nature and subject to completion of the Company's quarter-end financial reporting process. Final unaudited financial results may differ from these amounts and will be reported as part of the Company's quarter-end financial statements. Complete financial results for the first quarter 2026 will be reported and filed on Integra's profile on SEDAR+ at www.sedarplus.ca and EDGAR profile at www.sec.gov on Monday May 11, 2026.

    First Quarter 2026 Conference Call

    Integra will host a conference call and webcast on Tuesday May 12, 2026, at 11:00 AM Eastern Time / 8:00 AM Pacific Time, to discuss the first quarter 2026 results. Details for the conference call and webcast are included below.

    Dial-In Numbers / Webcast:

    Conference ID: 1860723

    Toll Free: (800) 715-9871

    Toll: +1 (646) 307-1963

    Webcast: https://events.q4inc.com/attendee/227670078

    About Integra Resources Corp.

    Integra is a growing precious metals producer in the Great Basin of the Western United States. Integra is focused on demonstrating profitability and operational excellence at its principal operating asset, the Florida Canyon Mine, located in Nevada. In addition, Integra is committed to advancing its flagship development-stage heap leach projects: the past producing DeLamar Project located in southwestern Idaho and the Nevada North Project located in western Nevada. Integra creates sustainable value for shareholders, stakeholders, and local communities through successful mining operations, efficient project development, disciplined capital allocation, and strategic M&A, while upholding the highest industry standards for environmental, social, and governance practices.

    ON BEHALF OF THE BOARD OF DIRECTORS

    George Salamis

    President, CEO and Director

    CONTACT INFORMATION

    Corporate Inquiries: ir@integraresources.com

    Company website: www.integraresources.com

    Office phone: 1 (604) 416-0576

    Qualified Person 

    The scientific and technical information contained in this news release has been reviewed and approved by James Frost, P.Eng., Director, Technical Services of Integra, who is a "Qualified Person" as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101").

    Forward Looking Statements

    Certain information set forth in this news release contains "forward‐looking statements" and "forward‐looking information" within the meaning of applicable Canadian securities legislation and in applicable United States securities law (referred to herein as forward‐looking statements). Forward-looking statements are often identified by the use of words such as "may", "will", "could", "would", "anticipate", "believe", "expect", "intend", "potential", "estimate", "budget", "scheduled", "plans", "planned", "forecasts", "goals" and similar expressions. Except for statements of historical fact, certain information contained herein constitutes forward‐looking statements which includes, but is not limited to, statements with respect to: the future financial or operating performance of the Company, the timing of the release of the Company's first quarter 2026 financial results and related conference call; expectations regarding gold production, recoveries and the timing of recovery of deferred ounces; anticipated benefits of completed and ongoing capital investments at the Florida Canyon Mine; expected performance of mining equipment; and anticipated improvements in productivity.

    Forward-looking statements are based on a number of factors and assumptions made by management and considered reasonable at the time such statement was made. Assumptions and factors include: the Company's ability to complete its planned exploration and development programs; the absence of adverse conditions at the Company's mineral properties including absence of any equipment or infrastructure failures; no unforeseen operational delays; no material delays in obtaining necessary permits; results of independent engineer technical reviews; the possibility of cost overruns and unanticipated costs and expenses; the price of gold remaining at levels that continue to render the Company's mineral properties economic; the Company's ability to continue raising necessary capital to finance operations; and the ability to realize on the mineral resource and reserve estimates. Forward‐looking statements necessarily involve known and unknown risks and uncertainties, which may cause actual performance and financial results in future periods to differ materially from any projections of future performance or result expressed or implied by such forward‐looking statements. These risks and uncertainties include, but are not limited to: general business, economic and competitive uncertainties; the actual results of current and future exploration activities; conclusions of economic evaluations; meeting various expected cost estimates; benefits of certain technology usage; changes in project parameters and/or economic assessments as plans continue to be refined; future prices of metals; possible variations of mineral grade or recovery rates; the risk that actual costs may exceed estimated costs; geological, mining and exploration technical problems; failure of plant, equipment or processes to operate as anticipated; accidents, labor disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; risks related to local communities; the speculative nature of mineral exploration and development (including the risks of obtaining necessary licenses, permits and approvals from government authorities); title to properties; and other factors beyond the Company's control and as well as those factors included herein and elsewhere in the Company's public disclosure. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in the forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Readers are advised to study and consider risk factors disclosed in Integra's Annual Information Form dated March 24, 2026 for the fiscal year ended December 31, 2025, which is available on the SEDAR+ issuer profile for the Company at www.sedarplus.ca and available as Exhibit 99.1 to Integra's Form 40-F, which is available on the EDGAR profile for the Company at www.sec.gov.

    Investors are cautioned not to put undue reliance on forward-looking statements. The forward-looking statements contained herein are made as of the date of this news release and, accordingly, are subject to change after such date. The Company disclaims any intent or obligation to update publicly or otherwise revise any forward-looking statements or the foregoing list of assumptions or factors, whether as a result of new information, future events or otherwise, except in accordance with applicable securities laws. Investors are urged to read the Company's filings with Canadian securities regulatory agencies, which can be viewed online under the Company's profile on SEDAR+ at www.sedarplus.ca.

    Cautionary Note for U.S. Investors Concerning Mineral Resources and Reserves

    NI 43-101 is a rule of the Canadian Securities Administrators which establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Technical disclosure contained in this news release has been prepared in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum Classification System. These standards differ from the requirements of the U.S. Securities and Exchange Commission ("SEC") and resource and reserve information contained in this news release may not be comparable to similar information disclosed by domestic United States companies subject to the SEC's reporting and disclosure requirements.

    Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

    Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/integra-announces-first-quarter-production-results-from-the-florida-canyon-mine-and-strengthened-balance-sheet-302752247.html

    SOURCE Integra Resources Corp.

    Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/April2026/23/c8981.html

    Get the next $ITRG alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $ITRG

    DatePrice TargetRatingAnalyst
    12/8/2025$5.75Buy
    Roth Capital
    10/22/2021$7.00 → $6.50Buy
    HC Wainwright & Co.
    7/20/2021$7.25 → $7.00Buy
    HC Wainwright & Co.
    More analyst ratings

    $ITRG
    SEC Filings

    View All

    SEC Form 6-K filed by Integra Resources Corp.

    6-K - Integra Resources Corp. (0001722387) (Filer)

    6/2/26 3:13:38 PM ET
    $ITRG
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by Integra Resources Corp.

    6-K - Integra Resources Corp. (0001722387) (Filer)

    5/29/26 2:04:41 PM ET
    $ITRG
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by Integra Resources Corp.

    6-K - Integra Resources Corp. (0001722387) (Filer)

    5/26/26 9:51:41 AM ET
    $ITRG
    Precious Metals
    Basic Materials

    $ITRG
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    INTEGRA APPOINTS AUSENCO TO LEAD DETAILED ENGINEERING AT DELAMAR, NEPA PUBLIC SCOPING PERIOD UNDERWAY

    TSXV: ITR; NYSE American: ITRGwww.integraresources.comVANCOUVER, BC, June 2, 2026 /CNW/ - Integra Resources Corp. ("Integra" or the "Company") (TSXV:ITR) (NYSE:ITRG) is pleased to announce the appointment of Ausenco Engineering USA South Inc. ("Ausenco") as lead engineering partner for detailed engineering activities at the Company's DeLamar Project ("DeLamar" or the "Project") in southwestern Idaho. As part of the engagement, Ausenco has retained SLR Consulting ("SLR"), which brings specialized heap leach engineering, metallurgy, and mine planning expertise to the Project. The start of detailed engineering marks a significant step in project development for DeLamar and coincides with the la

    6/2/26 6:30:00 AM ET
    $ITRG
    Precious Metals
    Basic Materials

    INTEGRA ANNOUNCES THE PUBLICATION OF FEDERAL NOTICE OF INTENT, A SIGNIFICANT PERMITTING MILESTONE FOR DELAMAR

    TSXV: ITR; NYSE American: ITRGwww.integraresources.comVANCOUVER, BC, May 29, 2026 /CNW/ - Integra Resources Corp. ("Integra" or the "Company") (TSXV:ITR) (NYSE:ITRG) is pleased to announce that the United States Bureau of Land Management ("BLM") has published the Notice of Intent ("NOI") in the Federal Register initiating the National Environmental Policy Act ("NEPA") review process for the DeLamar Project ("DeLamar" or the "Project") located in Idaho. The publication of the NOI represents a significant milestone in the advancement of DeLamar, formally commencing preparation of

    5/29/26 8:40:00 AM ET
    $ITRG
    Precious Metals
    Basic Materials

    INTEGRA STRENGTHENS ITS LEADERSHIP TEAM WITH THE APPOINTMENT OF THREE SEASONED MINING EXECUTIVES

    TSXV: ITR; NYSE American: ITRGwww.integraresources.comVANCOUVER, BC, May 26, 2026 /CNW/ - Integra Resources Corp. ("Integra" or the "Company") (TSXV:ITR) (NYSE:ITRG) is pleased to announce the appointment of Scott Trebilcock, as Senior Vice President, Corporate Development, Whitney Buhlin, as Vice President, Human Resources, and Josh Serfass as Vice President, Business Development & Investor Relations. George Salamis, President, Chief Executive Officer and Director of Integra, commented:"With the appointments of Scott, Whitney, and Josh, we believe Integra now has the leadership

    5/26/26 6:30:00 AM ET
    $ITRG
    Precious Metals
    Basic Materials

    $ITRG
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    Roth Capital initiated coverage on Integra Resources Corp. with a new price target

    Roth Capital initiated coverage of Integra Resources Corp. with a rating of Buy and set a new price target of $5.75

    12/8/25 8:34:44 AM ET
    $ITRG
    Precious Metals
    Basic Materials

    HC Wainwright & Co. reiterated coverage on Integra Resources with a new price target

    HC Wainwright & Co. reiterated coverage of Integra Resources with a rating of Buy and set a new price target of $6.50 from $7.00 previously

    10/22/21 6:20:01 AM ET
    $ITRG
    Precious Metals
    Basic Materials

    HC Wainwright & Co. reiterated coverage on Integra Resources with a new price target

    HC Wainwright & Co. reiterated coverage of Integra Resources with a rating of Buy and set a new price target of $7.00 from $7.25 previously

    7/20/21 6:05:07 AM ET
    $ITRG
    Precious Metals
    Basic Materials

    $ITRG
    Leadership Updates

    Live Leadership Updates

    View All

    INTEGRA APPOINTS AUSENCO TO LEAD DETAILED ENGINEERING AT DELAMAR, NEPA PUBLIC SCOPING PERIOD UNDERWAY

    TSXV: ITR; NYSE American: ITRGwww.integraresources.comVANCOUVER, BC, June 2, 2026 /CNW/ - Integra Resources Corp. ("Integra" or the "Company") (TSXV:ITR) (NYSE:ITRG) is pleased to announce the appointment of Ausenco Engineering USA South Inc. ("Ausenco") as lead engineering partner for detailed engineering activities at the Company's DeLamar Project ("DeLamar" or the "Project") in southwestern Idaho. As part of the engagement, Ausenco has retained SLR Consulting ("SLR"), which brings specialized heap leach engineering, metallurgy, and mine planning expertise to the Project. The start of detailed engineering marks a significant step in project development for DeLamar and coincides with the la

    6/2/26 6:30:00 AM ET
    $ITRG
    Precious Metals
    Basic Materials

    INTEGRA STRENGTHENS ITS LEADERSHIP TEAM WITH THE APPOINTMENT OF THREE SEASONED MINING EXECUTIVES

    TSXV: ITR; NYSE American: ITRGwww.integraresources.comVANCOUVER, BC, May 26, 2026 /CNW/ - Integra Resources Corp. ("Integra" or the "Company") (TSXV:ITR) (NYSE:ITRG) is pleased to announce the appointment of Scott Trebilcock, as Senior Vice President, Corporate Development, Whitney Buhlin, as Vice President, Human Resources, and Josh Serfass as Vice President, Business Development & Investor Relations. George Salamis, President, Chief Executive Officer and Director of Integra, commented:"With the appointments of Scott, Whitney, and Josh, we believe Integra now has the leadership

    5/26/26 6:30:00 AM ET
    $ITRG
    Precious Metals
    Basic Materials

    INTEGRA RESOURCES ANNOUNCES APPOINTMENT OF CHANTAL LAVOIE TO BOARD OF DIRECTORS

    TSXV: ITR; NYSE American: ITRGwww.integraresources.comVANCOUVER, BC, March 12, 2026 /CNW/ - Integra Resources Corp. ("Integra" or the "Company") (TSXV:ITR) (NYSE:ITRG) is pleased to announce the appointment of Chantal Lavoie, P.Eng., ICD.D, to the Company's Board of Directors. Mr. Lavoie is a mining engineer and seasoned executive with more than 40 years of experience in mine development, operations, capital project execution and corporate governance across gold, base metals, diamonds and iron ore. Most recently, Mr. Lavoie served as Chief Operating Officer of Rio Tinto Iron Ore

    3/12/26 4:05:00 PM ET
    $ITRG
    Precious Metals
    Basic Materials

    $ITRG
    Financials

    Live finance-specific insights

    View All

    INTEGRA ANNOUNCES STRATEGIC LAND ACQUISITION ADJACENT TO DELAMAR PROJECT

    TSXV: ITR; NYSE American: ITRGwww.integraresources.comVANCOUVER, BC, Feb. 17, 2026 /CNW/ - Integra Resources Corp. ("Integra" or the "Company") (TSXV:ITR) (NYSE:ITRG) is pleased to announce the acquisition of a strategically located 6,600-acre ranch (the "Ranch") contiguous with the Company's DeLamar Project in Owyhee County, Idaho ("DeLamar" or the "Project") for a purchase price of US$12.5 million (the "Acquisition"). The Ranch Acquisition supports the Company's strategy for de-risked and efficient Project advancement by consolidating land ownership surrounding key infrastruct

    2/17/26 4:05:00 PM ET
    $ITRG
    Precious Metals
    Basic Materials

    INTEGRA ANNOUNCES FOURTH QUARTER AND FULL YEAR 2025 GOLD PRODUCTION RESULTS FROM FLORIDA CANYON MINE, ACHIEVING PRODUCTION GUIDANCE AND SIGNIFICANT CAPITAL REINVESTMENT

    VANCOUVER, BC, Jan. 26, 2026 /PRNewswire/ - Integra Resources Corp. ("Integra" or the "Company") (TSXV:ITR, NYSE:ITRG) is pleased to provide an interim operational update for the fourth quarter ended December 31, 2025 (the "fourth quarter 2025" or "Q4 2025"). The Company plans to release its fourth quarter and full year 2025 financial results after market close on Tuesday, March 24, 2026, followed by a conference call hosted by senior management on Wednesday, March 25, 2026 at 11:00 AM Eastern Time / 8:00 AM Pacific Time. (All amounts in United States ("U.S.") dollars as at De

    1/26/26 4:30:00 PM ET
    $ITRG
    Precious Metals
    Basic Materials

    INTEGRA DELIVERS ROBUST FEASIBILITY STUDY FOR DELAMAR GOLD-SILVER HEAP LEACH PROJECT HIGHLIGHTING IMPROVED ECONOMICS AND REDUCED DEVELOPMENT RISK

    TSXV: ITR; NYSE American: ITRG www.integraresources.com VANCOUVER, BC, Dec. 17, 2025 /PRNewswire/ - Integra Resources Corp. ("Integra" or the "Company") (TSXV:ITR) (NYSE:ITRG) is pleased to announce the results of its Feasibility Study (the "FS") for the development of its wholly-owned DeLamar Gold and Silver Heap Leach Project ("DeLamar" or the "Project"), comprised of the DeLamar and Florida Mountain deposits, located in southwestern Idaho. (All amounts in United States ("U.S.") dollars unless otherwise stated) 2025 DeLamar Feasibility Study Highlights: Robust and resilient project returns: After-tax net present value 5% ("NPV") of $774 million ("M") and 46% after-tax internal rate of retu

    12/17/25 6:33:00 PM ET
    $ITRG
    Precious Metals
    Basic Materials

    $ITRG
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    SEC Form SC 13G/A filed by Integra Resources Corp. (Amendment)

    SC 13G/A - Integra Resources Corp. (0001722387) (Subject)

    5/3/24 4:13:12 PM ET
    $ITRG
    Precious Metals
    Basic Materials

    SEC Form SC 13G/A filed by Integra Resources Corp. (Amendment)

    SC 13G/A - Integra Resources Corp. (0001722387) (Subject)

    4/9/24 3:46:04 PM ET
    $ITRG
    Precious Metals
    Basic Materials

    SEC Form SC 13G/A filed by Integra Resources Corp. (Amendment)

    SC 13G/A - Integra Resources Corp. (0001722387) (Subject)

    2/14/24 2:10:06 PM ET
    $ITRG
    Precious Metals
    Basic Materials