• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    IperionX Titan DFS Confirms High-Return U.S. Rare Earths and Critical Minerals Project

    6/4/26 8:00:00 AM ET
    $IPX
    Other Metals and Minerals
    Basic Materials
    Get the next $IPX alert in real time by email

    U.S. Government supported Definitive Feasibility Study delivers US$813 million after-tax NPV8, 39% IRR and US$1.9 billion after-tax free cash flow from an initial 14-year mine plan producing heavy rare earth concentrate, titanium minerals and zircon in Tennessee, U.S.A.

    SOUTH BOSTON, Va., June 04, 2026 (GLOBE NEWSWIRE) -- IperionX Limited (IperionX) (NASDAQ:IPX, ASX: IPX)) is pleased to announce the results of the Definitive Feasibility Study (DFS or Study) for the Company's 100%-owned Titan Critical Minerals Project (Titan or Project), located near Camden, Tennessee, United States.

    The DFS confirms Titan as a large-scale, technically robust and high-return critical minerals project designed to produce titanium, zircon and a heavy rare earth concentrate from a single domestic resource in the United States. The Study underpins an initial 14-year mine plan based entirely on Proved and Probable Ore Reserves, with no Inferred Mineral Resources included in the Production Target.

    • Compelling after-tax returns: DFS delivers after-tax NPV8 of US$813 million, after-tax IRR of 39% and an after-tax payback period of 3.6 years
    • Significant cash generation: Forecast life-of-mine EBITDA of US$2.8 billion and after-tax free cash flow of US$1.9 billion over an initial 14-year mine plan
    • Capital-efficient staged development: Phase 1 development capital of US$228.1 million and Phase 2 incremental capital of US$153.2 million, for total development capital of US$381.3 million
    • Strong scale-up to Phase 2 cash flow: Phase 2 forecast average annual EBITDA of US$226 million and average annual after-tax free cash flow of US$172 million.
    • Maiden Ore Reserve: Reserves of 117 million tons at 3.2% THM, containing 3.7 million tons THM, with approximately 80% of Ore Reserves classified as Proved
    • High-value critical mineral products: Multi-critical mineral platform for American supply-chains from a single domestic resource base, including rare earths, titanium minerals and zircon. Phase 2 annual production forecast of approximately 5,287 tpa HREC (Heavy Rare Earth Concentrate), 118,658 tpa ilmenite, 24,656 tpa rutile and 65,668 tpa zircon concentrate
    • Heavy rare earth leverage: Titan HREC contains strategically important heavy rare earths dysprosium, terbium and yttrium (Dy, Tb, Y) and other heavy rare earth elements representing a large share of HREC basket value. The heavy rare earths are vital for U.S. supply chains for high-performance magnets, defense, advanced ceramics, aerospace, and semiconductor applications
    • Titanium and zircon critical minerals: Titan is positioned as a near-term, U.S.-based critical minerals platform for titanium and zircon critical minerals for downstream domestic metal production
    • Simple, modular execution pathway: Titan is a near-surface, free-dig mineral sands development with no blasting or hard-rock crushing, using industry standard wet concentration, flotation and dry mineral separation
    • U.S. infrastructure advantage: Titan Project is located in west Tennessee near road, rail, barge, power, water and gas infrastructure, with access to an established regional industrial workforce
    • U.S. Government-supported DFS pathway: The DFS was supported under U.S. Government IBAS-related funding, reinforcing Titan's strategic relevance to resilient domestic critical minerals and titanium supply chains for defense, aerospace, advanced manufacturing, energy and robotics
    • Strategic U.S. minerals-to-metals platform: Titan is positioned to underpin domestic critical mineral feedstock for U.S. heavy rare earth, titanium, zirconium and advanced materials supply chains, while complementing IperionX's downstream titanium metal technologies and Virginia manufacturing platform



    Key metrics from Titan DFS.

    Figure 1: Key metrics from Titan DFS.

    Titan's projected LOM production of ilmenite and rutile and HREC

    Figure 2: Titan's projected LOM production of ilmenite and rutile and HREC are estimated to contain sufficient titanium and NdPr- material to support the production of ~37,000 Boeing 787s, ~13 million electric vehicles, and ~5.7 million humanoid robots1.

    ___________________

    1 Figures shown are rounded. Based on Titan's annual Phase 2 projected and LOM projected production of titanium in ilmenite and rutile, and NdPr in HREC oxides. IPX estimates for material intensities for various end-use applications. Sources: Adamas Intelligence; Benchmark Minerals; ORNL; DoE; MDPI Minerals 2023, 13, 1274; Resources, Conservation & Recycling (2025) 107966



    METRIC



    UNITPHASE 1PHASE 2


    Mine life



    Years1-45-14


    Annual ore feed



    Mt pa3.510


    Ore and waste



    Mt117.0 Mt ore; 95.6 Mt waste (strip ratio: 0.82)


    Total development capital



    US$$228.1M$153.2M


    Operating costs



    US$/t ore$13.31$10.57


    Total LOM EBITDA



    US$$2.8B


    Total after-tax free cash flow



    US$$1.9B


    Phase 2 avg. annual EBITDA



    US$ pa$226M


    Phase 2 avg. annual after-tax FCF



    US$ pa$172M


    After-tax NPV8



    US$$813M


    After-tax IRR



    %39.4%


    After-tax payback period



    Years3.6
    Phase 2 annual production

    tpa



    HREC: 5,287





    Ilmenite: 118,658





    Rutile: 24,656





    Zircon concentrate.: 65,668



    Table 1: Summary DFS metrics2.

    ___________________

    2
    Units throughout the DFS are stated in metric tons

    IperionX CEO Taso Arima said:

    "The Titan DFS confirms Titan as one of the most compelling, shovel-ready rare earth and critical minerals development opportunities in the United States.

    The investment case is powerful: an after-tax NPV8 of US$813 million, after-tax IRR of 39.4%, US$1.9 billion of after-tax free cash flow and a 3.6-year payback. These outcomes are underpinned by key mine-area permits already in place, a Proved and Probable Ore Reserve base, a modular staged development pathway, conventional mineral sands processing, established infrastructure and a premier U.S. critical minerals jurisdiction.

    What makes Titan exceptional is the combination of strong economics, multi-critical-mineral diversity and direct relevance to U.S. supply-chain security. Titan is designed to produce a heavy rare earth concentrate enriched in dysprosium, terbium and yttrium, together with titanium minerals and zircon concentrate. These are critical feedstocks for high-performance permanent magnets, aerospace and defense systems, semiconductors, thermal barrier coatings, nuclear materials, zirconium and hafnium pathways, advanced ceramics and next-generation manufacturing.

    Titan is the leading asset of Tennessee's Big Sandy Critical Minerals Province — a large-scale, high-grade U.S. critical minerals system with the potential to become the largest domestic source of heavy rare earths, titanium and zircon minerals

    For IperionX, Titan is the cornerstone asset for an integrated U.S. critical minerals-to-metals strategy, connecting Tennessee rare earth and critical mineral feedstocks with downstream rare earth processing, permanent magnets, titanium metal production and American advanced manufacturing.

    Our objective is clear: to build a resilient, scalable and domestic critical minerals-to-metals platform that strengthens America's defense industrial base, reduces reliance on foreign-controlled supply chains and creates long-term value for IperionX shareholders."

    A copy of the full release can be found here.

    Cautionary Statement

    The Definitive Feasibility Study referred to in this announcement has been undertaken to assess the potential technical and economic viability of developing the Titan Project in Tennessee, United States. The DFS is a technical and economic assessment of the potential viability of the Project based on assumptions regarding mining, processing, infrastructure, operating costs, capital costs, commodity prices, permitting, environmental management, financing and other modifying factors.

    Investors should note that there is no certainty that the assumptions underpinning the DFS will prove to be correct, or that the outcomes indicated by the DFS (such as production targets and financial forecasts) will be achieved. Development of the Project will require (among other things) financing, permits, procurement, construction, commissioning and operating performance consistent with the assumptions in the DFS. Access to funding (if available) may be subject to conditions outside IperionX's control and may be dilutive or otherwise affect the value of IperionX securities.

    This announcement contains forward-looking statements. Forward-looking statements include (without limitation) statements regarding future mineral production, project development, capital costs, operating costs, commodity prices, revenues, cash flows, NPV, IRR, payback, mine life, permitting, construction, commissioning, market demand, offtake, financing and strategic outcomes. Actual results may differ materially from those expressed or implied by forward-looking statements.

    The Production Target, and forecast financial information derived from that Production Target, are based entirely on Ore Reserves and does not include Inferred Mineral Resources. Mineral Resource and Ore Reserve estimates are necessarily imprecise and depend on interpretations and geological assumptions, minerals prices, cost assumptions and statistical inferences (and assumptions concerning other factors, including mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social and governmental factors) which may ultimately prove to be incorrect or unreliable. Mineral Resource and Ore Reserve estimates are regularly revised based on actual exploration or production experience or new information and could therefore be subject to change. In addition, there are risks associated with such estimates, including (among other risks) that minerals mined may be of a different grade or tonnage from those in the estimates and the ability to economically extract and process the minerals may become compromised or not eventuate. The Company's plans, including its mine and infrastructure plans, and timing, for the Titan Project, are also subject to change. Accordingly, no assurances can be given that the production targets, financial forecasts or other forecasts or other forward-looking statements or information in this announcement or the DFS will be achieved.

    IperionX has concluded that it has a reasonable basis for providing the forward-looking statements included in this announcement and for holding the expectation that it will be able to complete the development of the Project, subject to the qualifications, assumptions and risks set out in this announcement and the underlying DFS.

    Forward Looking Statements

    Information included in this release constitutes forward-looking statements. Often, but not always, forward looking statements can generally be identified by the use of forward-looking words such as "may", "will", "expect", "intend", "plan", "estimate", "anticipate", "continue", and "guidance", or other similar words and may include, without limitation, financial forecasts, production targets, statements regarding plans, strategies and objectives of management, anticipated production or construction commencement dates and expected costs or production outputs. Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the Company's actual results, performance, and achievements to differ materially from any future results, performance, or achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and project development, including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of reserves, political and social risks, changes to the regulatory framework within which the company operates or may in the future operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial relations issues and litigation, as well as other uncertainties and risks set out in filings made by the Company from time to time with the Australian Securities Exchange and the U.S. Securities and Exchange Commission ("SEC").

    Forward looking statements are based on the Company and its management's assumptions relating to the financial, market, regulatory and other relevant environments that will exist and affect the Company's business and operations in the future. The Company does not give any assurance that the assumptions on which forward looking statements are based will prove to be correct, or that the Company's business or operations will not be affected in any material manner by these or other factors not foreseen or foreseeable by the Company or management or beyond the Company's control. There may be other factors that could cause actual results, performance, achievements, or events not to be as anticipated, estimated or intended, and many events are beyond the reasonable control of the Company. Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Forward looking statements in these materials speak only at the date of issue. Except as required by applicable law or stock exchange listing rules, the Company does not undertake any obligation to publicly update or revise any of the forward-looking statements or to advise of any change in events, conditions or circumstances on which any such statement is based.

    Competent Persons Statements

    The information in this announcement that relates to Exploration Results is based on, and fairly represents, information compiled and/or reviewed by Mr. Adam Karst, P.G., a Competent Person who is a Registered Member of the Society of Mining, Metallurgy and Exploration (SME) which is a Recognized Professional Organization (RPO). Mr. Karst is an employee of Karst Geo Solutions, LLC. Mr. Karst has sufficient experience which is relevant to the style and type of mineralization present at the Titan Project area and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" (the 2012 JORC Code). Mr. Karst consents to the inclusion in this report of the matters based on this information in the form and context in which it appears.

    The information in this announcement that relates to the Mineral Processing and Metallurgical Testing, Processing and Recovery Methods are based on, and fairly represents, information compiled and/or reviewed by Mr. Etienne Raffaillac, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy. Mr. Raffaillac is an employee of Mineral Technologies Pty Ltd. Mr. Raffaillac has sufficient experience which is relevant to the style and type of mineralization present at the Titan Project area and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" (the 2012 JORC Code). Mr. Raffaillac consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

    The information in this announcement that relates to Mineral Resource Estimate is based on, and fairly represents, information compiled and/or reviewed by Mr. John Eckman, a Competent Person who is a Certified Professional Geologist, American Institute of Professional Geologists (#CPG-11383) and a registered member of the Society for Mining, Metallurgy & Exploration (SME #4197942), both of which are Recognized Professional Organizations (RPO). Mr. Eckman is an employee of Marshall Miller & Associates. Mr. Eckman has sufficient experience which is relevant to the style and type of mineralization present at the Titan Project area and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" (the 2012 JORC Code). Mr. Eckman consents to the inclusion in this report of the matters based on this information in the form and context in which it appears.

    The information in this announcement that relates to Ore Reserve Estimate is based on, and fairly represents, information compiled and/or reviewed by Mr. Justin Douthat, a Competent Person who is a Registered Member of the Society of Mining, Metallurgy & Exploration (SME #4028345), which is a Recognized Professional Organizations (RPO). Mr. Douthat is an employee of Marshall Miller & Associates. Mr. Douthat has sufficient experience which is relevant to the style and type of mineralization present at the Titan Project area and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" (the 2012 JORC Code). Mr. Douthat consents to the inclusion in this report of the matters based on this information in the form and context in which it appears.

    The information in this announcement that relates to Cost Estimates and Economic Analysis is based on, and fairly represents, information compiled or reviewed by Mr. Alexandre Roy, a Competent Person who is a Registered Member of Ordres des Ingenieurs du Quebec, which is a Recognized Professional Organization (RPO). Mr. Roy is an employee of Primero Group Americas Inc. Mr. Roy has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Mineral Resources and Ore Reserves" (the 2012 JORC Code). Mr. Roy consents to the inclusion in this report of the matters based on this information in the form and context in which it appears.

    Contacts

    Anastasios (Taso) Arima, Founder and CEO

    Toby Symonds, President

    Dominic Allen, Chief Commercial Officer

    Investors: investorrelations@iperionx.com

    Media: media@iperionx.com

    +1 980 237 8900

    www.iperionx.com

    Photos accompanying this announcement are available at

    https://www.globenewswire.com/NewsRoom/AttachmentNg/b4c7d682-a2ec-459e-8f9f-dcd1f1d3214d

    https://www.globenewswire.com/NewsRoom/AttachmentNg/eba8ce43-8327-4c1e-aca4-dba662139553



    Primary Logo

    Get the next $IPX alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $IPX

    DatePrice TargetRatingAnalyst
    3/27/2026$40.00Buy
    BTIG Research
    1/13/2026Outperform
    William Blair
    8/20/2025$64.00Buy
    Roth Capital
    10/10/2024$30.00Buy
    B. Riley Securities
    More analyst ratings

    $IPX
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    IperionX Titan DFS Confirms High-Return U.S. Rare Earths and Critical Minerals Project

    U.S. Government supported Definitive Feasibility Study delivers US$813 million after-tax NPV8, 39% IRR and US$1.9 billion after-tax free cash flow from an initial 14-year mine plan producing heavy rare earth concentrate, titanium minerals and zircon in Tennessee, U.S.A. SOUTH BOSTON, Va., June 04, 2026 (GLOBE NEWSWIRE) -- IperionX Limited (IperionX) (NASDAQ:IPX, ASX: IPX)) is pleased to announce the results of the Definitive Feasibility Study (DFS or Study) for the Company's 100%-owned Titan Critical Minerals Project (Titan or Project), located near Camden, Tennessee, United States. The DFS confirms Titan as a large-scale, technically robust and high-return critical minerals project

    6/4/26 8:00:00 AM ET
    $IPX
    Other Metals and Minerals
    Basic Materials

    U.S. Army Testing Shows Iperionx Titanium Fasteners Exceed Grade 8 Steel Torque-To-Yield Performance

    SOUTH BOSTON, Va., June 01, 2026 (GLOBE NEWSWIRE) -- IperionX Limited (IperionX) (NASDAQ:IPX, ASX: IPX)) is pleased to announce positive titanium fastener test results from independent testing programs completed by the U.S. Army DEVCOM Ground Vehicle Systems Center (GVSC) and Westmoreland Mechanical Testing & Research (WMTR). The testing programs evaluated titanium fasteners produced using IperionX patented technologies against comparable high-strength SAE Grade 8 steel fasteners currently used in demanding defense and industrial applications. The results demonstrate that IperionX titanium fasteners can deliver high-strength steel-benchmark mechanical performance while retaining the weigh

    6/1/26 8:30:00 AM ET
    $IPX
    Other Metals and Minerals
    Basic Materials

    IperionX Commissions Six-Axis Powder Metallurgy Press, Expanding U.S. Titanium Component Manufacturing Capabilities

    Commissioned advanced 300-ton, six-axis SACMI powder metallurgy press at IperionX's Titanium Manufacturing Campus in South Boston, VirginiaTriples IperionX's existing powder metallurgy capacity and materially expands the range of high-value titanium powder-to-product components that can be manufactured in the United StatesSignificantly enhances product flexibility and production repeatability, enabling more complex near-net-shape titanium components including fasteners, gears, brackets, actuators and other high-value defense, aerospace and industrial partsHigh-productivity titanium manufacturing platform capable of up to 24 pressing cycles per minute, equivalent to approximately 11 million s

    5/21/26 8:30:00 AM ET
    $IPX
    Other Metals and Minerals
    Basic Materials

    $IPX
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    BTIG Research initiated coverage on IperionX with a new price target

    BTIG Research initiated coverage of IperionX with a rating of Buy and set a new price target of $40.00

    3/27/26 8:50:54 AM ET
    $IPX
    Other Metals and Minerals
    Basic Materials

    William Blair initiated coverage on IperionX

    William Blair initiated coverage of IperionX with a rating of Outperform

    1/13/26 8:28:47 AM ET
    $IPX
    Other Metals and Minerals
    Basic Materials

    Roth Capital initiated coverage on IperionX with a new price target

    Roth Capital initiated coverage of IperionX with a rating of Buy and set a new price target of $64.00

    8/20/25 8:56:28 AM ET
    $IPX
    Other Metals and Minerals
    Basic Materials

    $IPX
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    View All

    SEC Form 4 filed by President Symonds Toby Edgcumbe

    4 - IPERIONX Ltd (0001898601) (Issuer)

    4/30/26 9:30:54 AM ET
    $IPX
    Other Metals and Minerals
    Basic Materials

    SEC Form 4 filed by Director Martin Lorraine M

    4 - IPERIONX Ltd (0001898601) (Issuer)

    4/30/26 8:06:59 AM ET
    $IPX
    Other Metals and Minerals
    Basic Materials

    Chief Executive Officer Arima Anastasios bought $493,625 worth of Ordinary Shares (110,000 units at $4.49), increasing direct ownership by 0.90% to 12,316,782 units (SEC Form 4)

    4 - IPERIONX Ltd (0001898601) (Issuer)

    4/30/26 7:38:30 AM ET
    $IPX
    Other Metals and Minerals
    Basic Materials

    $IPX
    SEC Filings

    View All

    SEC Form 6-K filed by IperionX Limited

    6-K - IPERIONX Ltd (0001898601) (Filer)

    6/4/26 6:02:26 AM ET
    $IPX
    Other Metals and Minerals
    Basic Materials

    SEC Form 6-K filed by IperionX Limited

    6-K - IPERIONX Ltd (0001898601) (Filer)

    6/4/26 6:01:30 AM ET
    $IPX
    Other Metals and Minerals
    Basic Materials

    SEC Form 6-K filed by IperionX Limited

    6-K - IPERIONX Ltd (0001898601) (Filer)

    6/1/26 8:45:09 AM ET
    $IPX
    Other Metals and Minerals
    Basic Materials

    $IPX
    Insider Purchases

    Insider purchases reveal critical bullish sentiment about the company from key stakeholders. See them live in this feed.

    View All

    Chief Executive Officer Arima Anastasios bought $493,625 worth of Ordinary Shares (110,000 units at $4.49), increasing direct ownership by 0.90% to 12,316,782 units (SEC Form 4)

    4 - IPERIONX Ltd (0001898601) (Issuer)

    4/30/26 7:38:30 AM ET
    $IPX
    Other Metals and Minerals
    Basic Materials

    Executive Chairman Hannigan Todd bought $2,077,784 worth of Ordinary Shares (480,000 units at $4.33), increasing direct ownership by 2% to 26,108,334 units (SEC Form 4)

    4 - IPERIONX Ltd (0001898601) (Issuer)

    4/29/26 9:51:04 PM ET
    $IPX
    Other Metals and Minerals
    Basic Materials

    $IPX
    Financials

    Live finance-specific insights

    View All

    IperionX Interim Financial Report for the Six Months Ended December 31, 2024

    IperionX Limited (IperionX) (NASDAQ:IPX, ASX: IPX)) is pleased to present the Interim Financial Report for the six-months ended December 31, 2024, a period of significant development for the company as it commenced production of titanium metal at the Titanium Manufacturing Campus in Halifax County, Virginia, re-shoring an "all-American" domestic supply of titanium. A link to the report can be found here. About IperionX IperionX is a leading American titanium metal and critical materials company – using patented metal technologies to produce high performance titanium alloys, from titanium minerals or scrap titanium, at lower energy, cost and carbon emissions. Our Titan critical minerals

    3/13/25 8:30:00 AM ET
    $IPX
    Other Metals and Minerals
    Basic Materials

    $IPX
    Leadership Updates

    Live Leadership Updates

    View All

    IperionX Enhances Board With Appointment of Senior U.S. Directors

    IperionX Limited (IperionX) (NASDAQ:IPX, ASX: IPX)), a leading American titanium metal and critical materials company, is pleased to announce two significant appointments to its Board of Directors, effective from March 17, 2025. Appointment of Tony Tripeny as Non-Executive Director Mr. Tony Tripeny joins IperionX as an independent Non-Executive Director, and brings over 40 years of financial and operational leadership in advanced manufacturing, technology and materials science. Mr. Tripeny's successful 36-year career at Corning Incorporated, a global innovator and leader in advanced materials science, included senior roles of Executive Vice President and Chief Financial Officer, as well

    3/11/25 8:30:00 AM ET
    $IPX
    Other Metals and Minerals
    Basic Materials

    IperionX Appoints Harold Sears as Additive Manufacturing Senior Advisor

    IperionX Limited ("IperionX") (NASDAQ:IPX, ASX: IPX))) is pleased to announce the appointment of Harold Sears as Additive Manufacturing Senior Advisor. IperionX's lower cost, lower carbon and circular titanium metal powder is a critical input to manufacturing a wide range of specialized titanium components. Mr. Sears' appointment as Senior Advisor will increase IperionX's technical capability to rapidly additively manufacture high-quality, low-cost prototype and production titanium components for advanced industries. Mr. Sears brings over 32 years of experience in rapid manufacturing technologies, including 29 years in additive manufacturing. This includes a highly distinguished career at

    2/22/23 8:30:00 AM ET
    $F
    $IPX
    Auto Manufacturing
    Industrials
    Other Metals and Minerals
    Basic Materials

    IperionX Appoints Toby Symonds as Company President

    IperionX Limited ("IperionX" or "Company") (NASDAQ:IPX, ASX: IPX))), a leader in the development of a sustainable and circular titanium metal supply chain, today announced the appointment of Toby Symonds as President of IperionX. Mr. Symonds has worked with IperionX since 2021, first as an advisory board member and then as Chief Strategy Officer. He is a highly experienced executive with more than 30 years of experience across a range of senior roles in operations, sales, strategy, finance and asset management. Mr. Symonds previously served as a senior advisor to private equity, hedge funds and real estate asset managers, including Coliseum Capital Management, Sweetwater Capital Partners

    11/1/22 8:30:00 AM ET
    $IPX
    Other Metals and Minerals
    Basic Materials

    $IPX
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    SEC Form SC 13G/A filed by IperionX Limited (Amendment)

    SC 13G/A - IPERIONX Ltd (0001898601) (Subject)

    2/9/24 9:16:08 AM ET
    $IPX
    Other Metals and Minerals
    Basic Materials

    SEC Form SC 13G/A filed by IperionX Limited (Amendment)

    SC 13G/A - IPERIONX Ltd (0001898601) (Subject)

    11/13/23 9:16:15 AM ET
    $IPX
    Other Metals and Minerals
    Basic Materials

    SEC Form SC 13G filed by IperionX Limited

    SC 13G - IPERIONX Ltd (0001898601) (Subject)

    2/14/23 6:03:05 AM ET
    $IPX
    Other Metals and Minerals
    Basic Materials